5G eSIM South America

Autonomous City of Buenos Aires, Argentina
4.3 (81 reviews)
Instant Confirmation
Mobile Voucher

Available Options

Data per day · 1 day · Unlimited · Data only

eSIM
143 400 UZS
≈$12

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 2 days · Unlimited · Data only

eSIM
274 850 UZS
≈$23

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 3 days · Unlimited · Data only

eSIM
406 300 UZS
≈$34

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 5 days · Unlimited · Data only

eSIM
669 200 UZS
≈$56

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 7 days · Unlimited · Data only

eSIM
944 050 UZS
≈$79

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 8 days · Unlimited · Data only

eSIM
1 075 500 UZS
≈$90

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 10 days · Unlimited · Data only

eSIM
1 338 400 UZS
≈$112

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 15 days · Unlimited · Data only

eSIM
1 852 250 UZS
≈$155

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 30 days · Unlimited · Data only

eSIM
3 704 500 UZS
≈$310

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 2 days · 1GB · Data only

eSIM
83 650 UZS
≈$7

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 2 days · 3GB · Data only

eSIM
143 400 UZS
≈$12

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 3 days · 1GB · Data only

eSIM
119 500 UZS
≈$10

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 3 days · 3GB · Data only

eSIM
215 100 UZS
≈$18

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 5 days · 1GB · Data only

eSIM
191 200 UZS
≈$16

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 5 days · 3GB · Data only

eSIM
358 500 UZS
≈$30

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 7 days · 1GB · Data only

eSIM
274 850 UZS
≈$23

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 7 days · 3GB · Data only

eSIM
489 950 UZS
≈$41

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 8 days · 1GB · Data only

eSIM
310 700 UZS
≈$26

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 8 days · 3GB · Data only

eSIM
561 650 UZS
≈$47

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 10 days · 1GB · Data only

eSIM
382 400 UZS
≈$32

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 10 days · 3GB · Data only

eSIM
705 050 UZS
≈$59

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 15 days · 1GB · Data only

eSIM
573 600 UZS
≈$48

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 15 days · 3GB · Data only

eSIM
1 051 600 UZS
≈$88

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 30 days · 1GB · Data only

eSIM
1 147 200 UZS
≈$96

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 30 days · 3GB · Data only

eSIM
1 923 950 UZS
≈$161

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 1 day · 500MB · Data only

eSIM
35 850 UZS
≈$3

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 1 day · 1GB · Data only

eSIM
47 800 UZS
≈$4

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 1 day · 3GB · Data only

eSIM
131 450 UZS
≈$11

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 3 days · 1GB · Data only

eSIM
59 750 UZS
≈$5

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 3 days · 3GB · Data only

eSIM
131 450 UZS
≈$11

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 3 days · 5GB · Data only

eSIM
191 200 UZS
≈$16

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 7 days · 1GB · Data only

eSIM
59 750 UZS
≈$5

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 7 days · 3GB · Data only

eSIM
131 450 UZS
≈$11

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 7 days · 5GB · Data only

eSIM
203 150 UZS
≈$17

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 7 days · 10GB · Data only

eSIM
382 400 UZS
≈$32

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 15 days · 5GB · Data only

eSIM
227 050 UZS
≈$19

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 15 days · 10GB · Data only

eSIM
418 250 UZS
≈$35

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 15 days · 20GB · Data only

eSIM
681 150 UZS
≈$57

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 30 days · 5GB · Data only

eSIM
286 800 UZS
≈$24

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 30 days · 10GB · Data only

eSIM
478 000 UZS
≈$40

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 30 days · 20GB · Data only

eSIM
788 700 UZS
≈$66

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 30 days · 50GB · Data only

eSIM
1 661 050 UZS
≈$139

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 4 days · Unlimited · Data only

eSIM
537 750 UZS
≈$45

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 6 days · Unlimited · Data only

eSIM
812 600 UZS
≈$68

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 9 days · Unlimited · Data only

eSIM
1 206 950 UZS
≈$101

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 11 days · Unlimited · Data only

eSIM
1 469 850 UZS
≈$123

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 12 days · Unlimited · Data only

eSIM
1 481 800 UZS
≈$124

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 13 days · Unlimited · Data only

eSIM
1 613 250 UZS
≈$135

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 14 days · Unlimited · Data only

eSIM
1 732 750 UZS
≈$145

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 16 days · Unlimited · Data only

eSIM
1 983 700 UZS
≈$166

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 17 days · Unlimited · Data only

eSIM
2 103 200 UZS
≈$176

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 18 days · Unlimited · Data only

eSIM
2 222 700 UZS
≈$186

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 19 days · Unlimited · Data only

eSIM
2 354 150 UZS
≈$197

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 20 days · Unlimited · Data only

eSIM
2 473 650 UZS
≈$207

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 21 days · Unlimited · Data only

eSIM
2 593 150 UZS
≈$217

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 22 days · Unlimited · Data only

eSIM
2 712 650 UZS
≈$227

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 23 days · Unlimited · Data only

eSIM
2 844 100 UZS
≈$238

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 24 days · Unlimited · Data only

eSIM
2 963 600 UZS
≈$248

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 25 days · Unlimited · Data only

eSIM
3 083 100 UZS
≈$258

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 26 days · Unlimited · Data only

eSIM
3 214 550 UZS
≈$269

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 27 days · Unlimited · Data only

eSIM
3 334 050 UZS
≈$279

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 28 days · Unlimited · Data only

eSIM
3 453 550 UZS
≈$289

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 29 days · Unlimited · Data only

eSIM
3 585 000 UZS
≈$300

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 1 day · 1GB · Data only

eSIM
47 800 UZS
≈$4

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 1 day · 3GB · Data only

eSIM
71 700 UZS
≈$6

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 4 days · 1GB · Data only

eSIM
155 350 UZS
≈$13

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 4 days · 3GB · Data only

eSIM
286 800 UZS
≈$24

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 6 days · 1GB · Data only

eSIM
239 000 UZS
≈$20

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 6 days · 3GB · Data only

eSIM
418 250 UZS
≈$35

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 9 days · 1GB · Data only

eSIM
346 550 UZS
≈$29

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 9 days · 3GB · Data only

eSIM
633 350 UZS
≈$53

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 11 days · 3GB · Data only

eSIM
764 800 UZS
≈$64

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 12 days · 1GB · Data only

eSIM
466 050 UZS
≈$39

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 12 days · 3GB · Data only

eSIM
836 500 UZS
≈$70

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 13 days · 1GB · Data only

eSIM
501 900 UZS
≈$42

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 13 days · 3GB · Data only

eSIM
908 200 UZS
≈$76

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 14 days · 1GB · Data only

eSIM
537 750 UZS
≈$45

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 14 days · 3GB · Data only

eSIM
979 900 UZS
≈$82

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 16 days · 1GB · Data only

eSIM
621 400 UZS
≈$52

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 16 days · 3GB · Data only

eSIM
1 111 350 UZS
≈$93

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 17 days · 1GB · Data only

eSIM
657 250 UZS
≈$55

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 17 days · 3GB · Data only

eSIM
1 183 050 UZS
≈$99

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 18 days · 1GB · Data only

eSIM
693 100 UZS
≈$58

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 18 days · 3GB · Data only

eSIM
1 254 750 UZS
≈$105

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 19 days · 1GB · Data only

eSIM
728 950 UZS
≈$61

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 19 days · 3GB · Data only

eSIM
1 326 450 UZS
≈$111

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 20 days · 1GB · Data only

eSIM
764 800 UZS
≈$64

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 20 days · 3GB · Data only

eSIM
1 398 150 UZS
≈$117

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 21 days · 1GB · Data only

eSIM
812 600 UZS
≈$68

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 21 days · 3GB · Data only

eSIM
1 457 900 UZS
≈$122

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 22 days · 1GB · Data only

eSIM
848 450 UZS
≈$71

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 22 days · 3GB · Data only

eSIM
1 529 600 UZS
≈$128

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 23 days · 1GB · Data only

eSIM
884 300 UZS
≈$74

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 23 days · 3GB · Data only

eSIM
1 481 800 UZS
≈$124

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 24 days · 1GB · Data only

eSIM
920 150 UZS
≈$77

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 24 days · 3GB · Data only

eSIM
1 541 550 UZS
≈$129

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 25 days · 1GB · Data only

eSIM
956 000 UZS
≈$80

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 25 days · 3GB · Data only

eSIM
1 601 300 UZS
≈$134

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 26 days · 1GB · Data only

eSIM
991 850 UZS
≈$83

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 26 days · 3GB · Data only

eSIM
1 673 000 UZS
≈$140

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 27 days · 1GB · Data only

eSIM
1 039 650 UZS
≈$87

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 27 days · 3GB · Data only

eSIM
1 732 750 UZS
≈$145

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 28 days · 1GB · Data only

eSIM
1 075 500 UZS
≈$90

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 28 days · 3GB · Data only

eSIM
1 804 450 UZS
≈$151

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 29 days · 1GB · Data only

eSIM
1 111 350 UZS
≈$93

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 29 days · 3GB · Data only

eSIM
1 864 200 UZS
≈$156

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 1 day · 5GB · Data only

eSIM
191 200 UZS
≈$16

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 1 day · 10GB · Data only

eSIM
358 500 UZS
≈$30

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 2 days · 1GB · Data only

eSIM
59 750 UZS
≈$5

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 2 days · 3GB · Data only

eSIM
131 450 UZS
≈$11

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 2 days · 5GB · Data only

eSIM
191 200 UZS
≈$16

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 2 days · 10GB · Data only

eSIM
358 500 UZS
≈$30

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 3 days · 500MB · Data only

eSIM
35 850 UZS
≈$3

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 3 days · 10GB · Data only

eSIM
370 450 UZS
≈$31

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 5 days · 1GB · Data only

eSIM
59 750 UZS
≈$5

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 5 days · 3GB · Data only

eSIM
131 450 UZS
≈$11

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 5 days · 5GB · Data only

eSIM
203 150 UZS
≈$17

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 5 days · 10GB · Data only

eSIM
370 450 UZS
≈$31

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 5 days · 20GB · Data only

eSIM
621 400 UZS
≈$52

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 7 days · 20GB · Data only

eSIM
633 350 UZS
≈$53

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 10 days · 3GB · Data only

eSIM
143 400 UZS
≈$12

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 10 days · 5GB · Data only

eSIM
215 100 UZS
≈$18

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 10 days · 10GB · Data only

eSIM
394 350 UZS
≈$33

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 10 days · 20GB · Data only

eSIM
645 300 UZS
≈$54

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 15 days · 50GB · Data only

eSIM
1 505 700 UZS
≈$126

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 20 days · 5GB · Data only

eSIM
239 000 UZS
≈$20

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 20 days · 10GB · Data only

eSIM
430 200 UZS
≈$36

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 20 days · 20GB · Data only

eSIM
717 000 UZS
≈$60

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 20 days · 50GB · Data only

eSIM
1 577 400 UZS
≈$132

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 25 days · 5GB · Data only

eSIM
262 900 UZS
≈$22

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 25 days · 10GB · Data only

eSIM
454 100 UZS
≈$38

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 25 days · 20GB · Data only

eSIM
752 850 UZS
≈$63

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 25 days · 50GB · Data only

eSIM
1 625 200 UZS
≈$136

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data per day · 11 days · 1GB · Data only

eSIM
430 200 UZS
≈$36

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option

Data in total · 2 days · 500MB · Data only

eSIM
35 850 UZS
≈$3

Activate your eSIM Android / iOS

  • Your eSIM plan will begin upon connection to the destination mobile network, according to the time connected. For example, if you activate your 3-day plan at 10:00, it will end 3 days later at 10:00.

  • Activate your Klook eSIM before travel

Activate your eSIM before travel

Activate your Klook eSIM before travel

  • Klook eSIM installation methods

Activate your eSIM via Klook in-app activation, scanning the QR code, or entering the SMDP+ details manually

Klook eSIM installation methods

  • Klook eSIM In-app activation

Click Add eSIM to device on your booking to start the installation. Don't worry, data and validity will only commence when you reach your destination

Klook eSIM In-app activation

  • Klook eSIM In-app activation

Installation of your eSIM will start automatically

Klook eSIM In-app activation

  • Klook eSIM iOS installation

Set up your Klook eSIM for travel on iOS

Klook eSIM iOS installation

  • Klook eSIM installed

Your eSIM is ready for use! Usage and validity start only when the eSIM connects to an overseas network

Klook eSIM installed

  • Turn on Klook eSIM

Turn on Klook eSIM and select Klook eSIM for mobile data

Turn on Klook eSIM

  • Turn on Data roaming

Switch on data roaming at your destination to start using your eSIM

Turn on Data roaming

  • Klook eSIM connected

Your klook esim is connected! Track your data balance and validity through the Klook app

Klook eSIM connected

Confirmation policy

  • You'll get confirmation within minutes. If you don't see any confirmation, reach out to our customer support.

Select This Option
From
35 850 UZS per person
≈$3
Cashback up to 1 792 so'm
Select Option & Book

Choose from available options above

Secure payment
Instant Confirmation

Similar Activities